Upminster Tithe Barn
Project Info
This comprehensive restoration project has brought new life to a medieval timber-framed barn while preserving its unique character and historical value.
Situated in East London, this 15th-century grange barn, which had been placed on the Heritage at Risk register, has now been fully restored using traditional materials and techniques to secure its legacy for future generations.
Essential timber repairs have restored the oak frame’s failed, missing, and decayed elements, while a complete rethatch of the roof using water reed has addressed extensive roof degradation and safeguarded the barn’s structural integrity. Detailed assessments ensured that timber repairs were carried out only where necessary and with minimal intervention. The use of new seasoned oak was precisely targeted, helping to preserve the character of the original structure while securing its long-term stability.
Modern interventions have been thoughtfully integrated to enhance safety and durability. These upgrades included lightning protection, fire detection and alarm systems. Plinth repairs were made to stabilise the structure and prevent further decay of the timber frame.
Hosting visits from local schools, heritage groups and local councillors, community engagement has played a crucial role throughout the project, and with plans being scoped for a second phase of works, the barn is set to become a vibrant community asset once more.
Additional credits
Funding & Joint Client: Lower Thames Crossing | Historic England | London Borough of Havering
LocationUpminster
ArchitectPurcell
Structural EngineerConsibee
Wood SupplierEssex Oak Frame
ContractorLexden Contracts
SpeciesEuropean Green Oak (France)
ClientLondon Borough of Havering
JoineryEssex Oak Frame
PhotographerHistoric England, Chris Redgrave and Liane Ryan Photography